Scope of Work – Tasks to be Covered
On 16th May
Build Phase – Pre-Installation Activities:
Verify & Validate the Bill of Materials (active & passive components).
Receive and Inspect network equipment (switches, APs, controllers, firewalls).
Rack and Stack devices in designated positions as per the layout plan.
Cable Management:
Identify and label network cables for installation.
Power Setup:
Verify available